First: Efficiency
An optimal production line is a priority

The biggest challenge?
Identifying the actual bottleneck in the process.
The analysis revealed an unexpected correlation: the forklift was a critical resource for the efficiency of the entire system, even though its utilization rate was less than 30%. The key issue, therefore, was not its overall workload, but its response time and how the process was managed.
Main Goal:
The goal of the project was to explore ways to increase the productivity of the production line for synthetic concrete additives. To this end, we built a simulation model of the production process in FlexSim, which allowed us to analyze material flow, resource utilization, and the load on individual system components.

We strive toward our goal – always
The results of our work on this project

Explore the potential of your process
Bottlenecks are not always located where basic resource utilization metrics indicate. The FlexSim simulation model allows you to see the interdependencies throughout the system and test potential improvements before implementing them.